Odoo 19 to Odoo 20 migration: what changes and how we move you
Odoo 20 arrived in September 2026 and reworked access rights, charts of accounts, fixed assets and payroll time. Brainvire inventories your Odoo 19, makes each module installable on 20, then proves it on a copy before a date is agreed.
Moving a live database from Odoo 19.0 to Odoo 20.0. Odoo’s own upgrade platform performs the technical conversion of the standard modules and data. Making custom modules work on 20 is the customer’s or partner’s responsibility, and that’s where the real work sits.
Teams running Odoo 19.0 in production, especially those carrying custom modules, Studio changes, record rules of their own or a payroll built on work entries.
We plan a straight version upgrade at 3–8 weeks, assuming a code freeze and one full rehearsal. These are our own planning figures, not Odoo published ones. Where new scope travels with the upgrade, our implementation bands apply instead.
A technical consultant who ports the modules, a functional consultant who owns the test script, a solution architect on the upgrade posture, and your application owner as counterpart. On-premise, add whoever runs your servers.
/ Before the next version lands
Why does the Odoo 19 upgrade keep getting postponed?
Four reasons we hear, and none of them is the upgrade itself.
The window on 19 is published, not negotiable
Odoo lists standard support for 19.0 to September 2028, marked planned. On Odoo Online, a database on a 19.x minor version must move a few weeks after the next version ships, automatically if nobody acts.
Nobody has listed what sits above the standard
Studio changes, custom modules, third-party apps, security rules written years ago. Odoo will not upgrade a database with custom modules until a version of them exists for the target release.
Odoo 20 may already ship what you paid to build
Suggested minimum and maximum stock levels for reordering rules, automatic customer invoice reminders, manufacturing orders you can split or reset to draft. Odoo’s guidance is to challenge every customization against what the new version added.
The server needs an upgrade before Odoo does
Self-hosted Odoo 20 needs Python 3.12 and PostgreSQL 16 or later, up from 3.10 and 13 on Odoo 19. That’s server work with its own maintenance window.




Trusted by enterprise Odoo teams worldwide












/ Version to version
What actually changed between Odoo 19 and Odoo 20?
Twelve changes that alter how a working Odoo 19 database behaves on 20, from Odoo’s own Odoo 20 release notes and its 20.0 developer and installation docs. Entries marked as available from an earlier version are left out; the third column is our reading, not theirs. Headline features are in Odoo’s launch post, Meet Odoo 20.
| Area | What Odoo 20 changed | What it means for your upgrade |
|---|---|---|
| Access rights | Record rules were removed. A domain on each access right now decides which records it covers, through the ir.access model | Custom security files are ported, then tested as real users. Superuser mode bypasses both, so an admin test proves nothing |
| Chart of accounts | Account groups were replaced by parent accounts as the way to structure a chart of accounts, and account codes are now optional | Reports, exports and integrations keyed on account groups or codes are checked with finance |
| Fixed assets | Asset models were replaced by depreciation models, and asset settings moved onto the asset accounts | Asset setup is reviewed with the owner of the fixed-asset register |
| Fiscal positions | Taxes are only allowed in their own fiscal positions. A default tax outside the invoice’s position is removed, even with no replacement | Multi-regime invoicing is re-tested line by line |
| Payments and bank | Payment status “In Process” is now “Paid”, and “Paid” is now “Reconciled”. Entries that hit bank accounts must come from bank transactions | Dashboards, filters and integrations that read “Paid” change meaning. Manual bank entries stop |
| Expenses | The standalone Employee Expenses menu was removed. Approved expenses now create draft bills in the default expense journal | Expense posting moves into the bill queue, so approval flows and reports are re-tested |
| Payroll | Work entries and the Planning-Payroll integration were removed, and work entry types were merged with time off types | Payroll rules built on work entries are redesigned, then tested on a real pay period |
| Field Service | The Field Service app was discontinued and merged into Planning. Worksheet templates now use property fields, not Studio fields | Worksheets and their Studio fields are mapped before the upgrade |
| Manufacturing and inventory | The flexible consumption setting was removed: every manufacturing order consumes flexibly. “Produce” and “Produce All” merged, and the return wizard was removed | Strict-consumption controls need a new home; custom return flows are rebuilt |
| AI | All AI features now need IAP credits. Agents can create and update records and run from automated and scheduled actions. Outside AI tools can connect to the database over MCP | Budget the credits, and decide what each agent may write before go-live |
| Server requirements | The 20.0 installation guide sets Python 3.12 and PostgreSQL 16 as minimums, up from 3.10 and 13 | On-premise, the server is upgraded first, in its own window |
| Framework and code | Tracking values were removed, Font Awesome icons gave way to Material Symbols, and the developer changelog removes Model._table_query | Code that reads tracking values, uses Font Awesome or builds SQL-view models is checked early |
/ Responsibilities
Who does what in an Odoo 19 to 20 upgrade?
The boundaries are published, not negotiable. All of it is stated in Odoo’s upgrade documentation and its guide to upgrading a customized database. We name them here so nobody finds the boundary in week five.
Odoo converts the standard database
Odoo’s upgrade platform performs the technical conversion of standard modules and data. Its Enterprise agreement covers standard applications, Studio customizations while Studio stays installed and subscribed, and developments under a maintenance of customizations subscription. A partner doesn’t perform this step.
Your custom modules are our job
That same agreement excludes additional modules without a maintenance contract, built in-house or by third parties, including Odoo partners. So we port them: each module made installable on an empty Odoo 20 database first, then on the upgraded copy.
Three things no upgrade includes
Odoo lists what its upgrade service does not cover: cleaning pre-existing data and configurations while upgrading, upgrading additional modules without a maintenance contract, and training people on the new version. An upgrade also won’t downgrade, switch editions or bring in another ERP.
Testing is shared, and it’s the point
Odoo is explicit: if a change in a new version breaks a customization, making it compatible is the responsibility of whoever maintains that module. We test on a copy against your real flows, and what fails is fixed before a date is agreed.
/ Delivery
How does a 19 to 20 upgrade actually run?
Odoo publishes a six-step path for a customized database; we run it as four stages. We plan a straight version upgrade at 3–8 weeks, our own figure rather than Odoo’s. With new scope, our implementation bands apply instead.
Freeze and challenge
Development stops: anything built during the upgrade has to be upgraded and tested again. Every customization is argued against what Odoo 20 does as standard, and the redundant ones retired here.
Prepare the server, request a test copy
On-premise, Python and PostgreSQL move first. Then Odoo delivers a converted copy via the Upgrade platform, the Odoo Online database manager, your Odoo.sh project or the command line.
Make every module installable on 20
Each module goes on an empty Odoo 20 database first, so tracebacks come from the module rather than your data, then on the upgraded copy. Record rules become access-right domains; renamed models and fields need upgrade scripts.
Test, rehearse, cut over
Your flows run end to end on the upgraded copy, logged in as real roles, including integrations, server actions and exports. We rehearse the day before, then upgrade production in your quietest window: it’s unavailable throughout.
/ Scope
What makes a 19 to 20 upgrade bigger or smaller?
Four things decide it, and only one of them is Odoo. Two databases on the same version and hosting can land far apart on this list.
How many, and how they were built
Odoo names what breaks first: invalid dependencies, changed asset declarations, references to fields, models or views that no longer exist, xpaths that moved. On 20, record rules in security files join that list.
What was changed without code
Studio work is carried by the upgrade service while Studio stays installed and the subscription is active. Field Service worksheets need a look of their own: Odoo 20 moved their templates from Studio fields to property fields.
What talks to the database
EDI feeds, APIs, connectors and scheduled jobs sit on Odoo’s own do-not-forget-to-test list, alongside automated actions and data exports. On 20, anything that reads payment statuses or account codes is on ours.
Where the database lives
Odoo Online, Odoo.sh and on-premise each request the upgrade differently and each carries its own obligation to move. On-premise adds the server work: Python 3.12 and PostgreSQL 16 come first.
/ Version moves, on the record
Have we moved a customized Odoo database before?
Three version-to-version moves, each with the case study behind it.
Accelerated Solutions Group
ASG manufactures automotive accessories. Its Odoo 13 setup had turned complex under customization, so we moved it to Odoo 16: analytical accounts attach to order lines automatically, work orders are approved in bulk, and manufacturing orders post labor cost.
Read the case →
CURE International
A non-profit running children’s hospitals across several countries. The Odoo 16 upgrade put eight sites on one centralized inventory and purchase system, replaced manual stock adjustments with automated records, and structured the approval workflows.
Read the case →
AMASCO LLC
AMASCO runs repairs and maintenance across oil and gas, maritime and Gulf shipping. We moved its Odoo backend from 14 to 16 and rebuilt the customizations: a project created when a quote is accepted and linked to procurement, plus requisitions that pass approval first.
Read the case →
/ The timing decision
Should you upgrade to Odoo 20 now, or wait?
Both are real answers, and we size both before you decide. Dates come from Odoo’s published standard and extended support table, which marks future end dates as planned. The obligation to move comes from its upgrade documentation and differs per hosting type. Move now if your customization surface is light; wait if the module list needs a project of its own, or payroll still runs on work entries.
| Criterion | Upgrade to Odoo 20 now | Wait |
|---|---|---|
| Support runway Odoo publishes | Odoo 20.0 was released September 2026, with standard support listed to September 2029 and marked planned | Odoo 19.0 is listed to September 2028, also planned, and that window only narrows |
| Who picks the date | You do, inside your own release calendar | On Odoo Online a major version must be upgraded every two years, automatically if no action is taken by the due date |
| Version gap for your custom code | One major version. Odoo notes that the smaller the version gap, the easier the upgrade should be | Two versions once the next release lands, absorbed in one test cycle |
| Release notes to absorb | The Odoo 20 release notes, one set | Those plus the next release’s, arriving together |
| Server work, if you self-host | Python 3.12 and PostgreSQL 16 before the move | Odoo 19 keeps running on the Python 3.10 and PostgreSQL 13 minimums it shipped with |
| What arrives on day one | Access-right domains, parent accounts, depreciation models, AI agents that can write, and the rest of the 20 list | The same list later, with more standard change to work through in one pass |
/ Questions we are asked
Odoo 19 to 20 migration FAQs.
What is an Odoo 19 to 20 migration?
It's a version upgrade: a live Odoo 19.0 database moved onto Odoo 20.0. Odoo's own upgrade platform converts the standard modules and data. The work that takes the time sits above that line. It means making every custom module installable on 20, porting custom security rules and proving your flows still run on a test copy.
What changed in Odoo 20 that affects an upgrade?
Odoo's release notes list the changes that matter most. Record rules were removed in favor of a domain on each access right. Account groups gave way to parent accounts, and account codes became optional. Asset models became depreciation models. Work entries left Payroll, Field Service moved into Planning, and every AI feature now draws on IAP credits.
Who runs the upgrade, Odoo or the partner?
Odoo does. Its upgrade platform performs the technical conversion of standard modules and data to the target version, and a partner doesn't perform that step. Odoo's service level agreement covers standard applications, Studio customizations while Studio stays installed and subscribed, and developments under a maintenance of customizations subscription. Custom modules outside that, built in-house or by partners, are ours to port.
Will our custom modules run on Odoo 20?
Only after somebody ports them. Odoo won't upgrade a database with custom modules until a version of those modules exists for the target release. Its developer changelog lists the framework changes made between 19.0 and 20.0, including the ir.access model that merges access control lists and record rules. We install each module on an empty Odoo 20 first, then on the upgraded copy.
How long does a 19 to 20 upgrade take?
We size a straight version upgrade at 3–8 weeks. That band is ours, not something Odoo publishes, and it assumes development is frozen and one full rehearsal happens before go-live. If new scope rides along with the upgrade, our implementation bands apply instead: 8–12 weeks small, 12–24 weeks mid-market.
How long is Odoo 19 supported?
Odoo's support table lists Odoo 19.0 as released in September 2025, with standard support ending September 2028. Odoo 20.0 was released in September 2026, with standard support ending September 2029. Both end dates are marked planned. Security updates are only provided during standard support. Extended support carries an additional fee and runs only on Odoo.sh, for a limited number of versions, and on-premise.
Is upgrading to Odoo 20 mandatory?
It depends on hosting. On Odoo Online, a major version must be upgraded every two years, and a minor version such as 19.4 a few weeks after the next version is released. Odoo triggers the upgrade automatically if no action is taken by the due date. Odoo.sh allows two further years after the three of support. On-premise databases may stay put indefinitely, which Odoo doesn't recommend.
Do Odoo 20's AI features cost extra?
They draw on credits. Odoo's Odoo 20 release notes state that all AI features now need credits, which can be bought through in-app purchase (IAP). The release notes don't give a rate, so confirm the current one with Odoo before planning automations that lean on agents. Topics, the instruction sets that shape an agent, are now called skills.
Can Odoo 20 AI agents change our data?
Yes, when asked to. Odoo 20's release notes list agents that create and update records, and agents that automated and scheduled actions can summon. The release notes add MCP connections for outside tools, and Odoo's launch post says an external AI tool can read and write your data with your access rights intact. That makes the access-rights review in this upgrade a security task, not housekeeping.
What happens to our record rules in Odoo 20?
They become domains on access rights. Odoo's release notes say record rules were removed and a domain added at the access-right level, and the 20.0 security reference documents the ir.access model that carries it. Odoo converts standard data; security files in custom modules are ported by whoever maintains them. Test as real roles, because superuser mode bypasses record rules and access rights.
What happens to account groups and asset models?
Both are replaced. Odoo 20's release notes say parent accounts replaced account groups as the way to structure a chart of accounts, with account codes now optional. Asset models were replaced by depreciation models, and asset settings moved onto the asset accounts themselves. Reports, exports and integrations that read either structure are re-checked with finance before the upgrade.
Our payroll uses work entries. What changes?
Work entries are gone. Odoo 20's release notes say work entries and the Planning-Payroll integration were removed, and work entry types were merged with time off types. Working schedules can now set a time per day without start and end times. Any payroll rule or report built on work entries is redesigned, then tested against a real pay period, not a sample payslip.
/ Next step
Let’s find out what is really sitting on top of your Odoo 19.
- A senior architect replies within one business day
- Your details are never shared or sold
- An NDA can be signed before we hear any detail
US +1 (631) 897-7276 · Gulf +971-54-737-4253 · Singapore +65-9086-0319 · India +91-22-6116-3300.









Trusted by 2,000+ brands worldwide
“Brainvire has helped our business grow. We feel like it’s a true partnership. They’re always present. It’s been seven great years, looking forward to more.”
Book a working session
Tell us which Odoo version you run and what has been built on top of it.